Installation Steps1. Mount Illuminator2. Connect PowerSet Up Steps1. Optional night set-up for optimum image performance 2. Adjust vertical angle3
2 !Install in a well ventilated areaSpecifications subject to change without notice. Installation to be carried out by suitable trained and qual
3Installation 1Mount illuminator Connect Power212Set Up1Optional night set-up for optimum image performanceTARGETTighten all fixings2 3Adjust vertical
4Technical Drawings (Not to scale)Optional BracketryWall MountStandard BracketryRM 25 PoESpecificationsINFRA-RED SeriesInput Output PoE PhotocellAdjust
5Trouble ShootingStep 1: BasicsCheck blue LED ‘power on’ light is illuminated on the back of the PoE unit.If Ye s,• Ensure power adjust is turned to
UK / EuropeT: +44 (0) 1670 520055F: +44 (0) 1670 819760 [email protected] (Toll Free)T: +1 888 505 [email protected]
Kommentare zu diesen Handbüchern